Prestwich Hospital

DDA Ramp

The Hospital wanted to reinstate the partially demolished ramp to the prefabricated Dialysis unit.
We built the new ramp off the existing base with a new dwarf wall, concrete ramp and DDA handrails. The existing wall was rendered to give it a better finish.

 

We had to knock a hole through the wall, install a lintel and make good to enable us to fit a new oak combination frame.